Combined Crew Vegetation Management on the Curecanti-Poncha 230 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area P...
Routine Maintenance of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado CX(s) Applied: B1.3 Date: 05/22/2012 Location(s): Color...
Rifle and Craig Substation Modifications and Approach Spans Re-Conductoring Garfield County, Rifle, Colorado and Moffat County, Craig, Colorado CX(s) Applied: B4.6, B4.13 Date: 05/22/2012 Location(s): Colorado Offices(s): Western Area Power Administra...
Big Thompson to Flatiron 13.8 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Archer to Ault 230 Kilovolt Transmission Line Structure Replacement, Weld County, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration and Tri-State Generation and Transmission Association, Inc. Fiber Optic Installation Project From Beaver Creek to Big Sandy Substations Morgan, Washington, and Lincoln Counties, Colorado CX(s) Applied: B1.3 Date: 05/0...
Granby Pumping Plant Switchyard - Transformer Protective Barrier Walls CX(s) Applied: B4.6 Date: 05/04/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region