Categorical Exclusion Determinations: Western Area Power Administration-Rocky Mountain Region

Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Torrington-Wildcat 69 Kilovolt Transmission Line Rebuild Project CX(s) Applied: B4.13 Date: 04/02/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Cheyenne Substation West Control Building Roof Replacement CX(s) Applied: B1.3 Date: 04/02/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Erosion Control Measures Structure No. 20-1 East Morrill Tap to Lyman 34.5 Kilovolt Transmission Line, Scotts Bluff County, Nebraska CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountai...
Bridgeport-Sidney 115 Kilovolt Line Rejected Pole Replacement CX(s) Applied: B1.3 Date: 03/16/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
Danger Tree Management on Estes-Pole Hill and Pole Hill-Flatiron 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 03/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Archer 230 Kilovolt Bay Addition for New Point of Delivery - Stage 07 CX(s) Applied: B4.6 Date: 03/08/2012 Location(s): CX: none Offices(s): Western Area Power Administration-Rocky Mountain Region