Ault Substation Drainage Swale Construction CX(s) Applied: B4.6 Date: 12/13/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Office of NEPA Policy and Compliance
December 13, 2012Ault Substation Drainage Swale Construction
CX(s) Applied: B4.6
Date: 12/13/2012
Location(s): Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration proposes to construct and reconstruct portions of a drainage swale that extends 568 feet by 15 feet wide along the southern fence line of the 230-kilovolt portion of the Ault Substation.
CX(s) Applied: B4.6
Date: 12/13/2012
Location(s): Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration proposes to construct and reconstruct portions of a drainage swale that extends 568 feet by 15 feet wide along the southern fence line of the 230-kilovolt portion of the Ault Substation.