Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remove a control building at the Four Corners Microwave (FCM) si…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to rebuild the entire 33.4 miles of Glendo-Podolak (GLD-PK) 115-kV …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Sterling-Sidney (…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 0/4, 11/5, 12/4, 14/1, 14/2, 15/2, 1…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to purchase an additional 40 feet of Right of Way (ROW) on the …
The U.S. Department of Energy (DOE) is proposing to provide federal funding to J-TECH LLC for the development and testing of an innovative wastewat…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted an emergency replacement of structure 15/2 on its existing Cheyenn…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency guy wires and anchors replacmenet on its existing Sterli…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing anchors and guy wires on Structure 1/3 on the S…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road maintenance on the existing graveled…