Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Stegall-Gering No…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structure 3/4 and 4/8 on the Boysen-Pilot Butte…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remove a control building at the Four Corners Microwave (FCM) si…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to rebuild the entire 33.4 miles of Glendo-Podolak (GLD-PK) 115-kV …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Sterling-Sidney (…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 0/4, 11/5, 12/4, 14/1, 14/2, 15/2, 1…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to purchase an additional 40 feet of Right of Way (ROW) on the …
The U.S. Department of Energy (DOE) is proposing to provide federal funding to J-TECH LLC for the development and testing of an innovative wastewat…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted an emergency replacement of structure 15/2 on its existing Cheyenn…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency guy wires and anchors replacmenet on its existing Sterli…