Categorical Exclusion Determinations: Washington

200 East Area Communications Tower and Instrument TrailerCX(s) Applied: B1.19Date: 05/04/2010Location(s): Richland, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Nisqually Indian Tribe of the Nisqually Reservation Energy Efficiency Retrofits of Tribal CenterCX(s) Applied: B2.5, B5.1Date: 05/03/2010Location(s): Nisqually Reservation, WashingtonOffice(s): Energy Efficiency and Renewable Energy
Rocky Reach-Maple Valley Number-1 Transmission Line Bridge Replacement ProjectCX(s) Applied: B1.3Date: 05/03/2010Location(s): Kittitas County, WashingtonOffice(s): Bonneville Power Administration
Acoustic Effects of Hydrokinetic Tidal TurbinesCX(s) Applied: B3.1, B3.3, A9Date: 04/29/2010Location(s): Snohomish County, WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Barr-Tech - Green Waste To Renewable EnergyCX(s) Applied: B5.1Date: 04/28/2010Location(s): Sprague, WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
C-Farm Electrical, Lighting, and Walkway UpgradesCX(s) Applied: B1.13, B2.1, B1.3Date: 04/27/2010Location(s): Richland, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Spacer replacement along the Hanford-Wautoma #1 and #2 (substation to substation) transmission linesCX(s) Applied: B1.3Date: 04/23/2010Location(s): Benton County, WashingtonOffice(s): Bonneville Power Administration