Spirit Tap to Colville-Boundary #1 Landings and Access Roads ConstructionCX(s) Applied: B1.3, B1.13Date: 10/27/2009Location(s): Stevens County, WashingtonOffice(s): Bonneville Power Administration
Washington County ClarkCX(s) Applied: A9, A11, B5.1Date: 10/27/2009Location(s): Clark County, WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Gray's River Chum Supplementation ProgramCX(s) Applied: B1.20Date: 10/08/2009Location(s): Gray's River,WashingtonOffice(s): Bonneville Power Administration
Routine Access Road Maintenance to the Rockdale Microwave SiteCX(s) Applied: B1.3Date: 10/07/2009Location(s): King County, WashingtonOffice(s): Bonneville Power Administration
Suquamish Indian Tribe of the Port Madison Reservation, Washington - Traffic Signals and Street LightingCX(s) Applied: B5.1Date: 09/30/2009Location(s): WashingtonOffice(s): Energy Efficiency and Renewable Energy
Install a Photovoltaic Power Generation Array and Electric Car Charging Stations, Environmental Molecular Sciences LaboratoryCX(s) Applied: B1.15Date: 09/30/2009Location(s): Richland, WashingtonOffice(s): Science, Pacific Northwest Site Office
331 Building Irrigation Upgrades, 300 AreaCX(s) Applied: B2.5Date: 09/23/2009Location(s): Richland, WashingtonOffice(s): Science, Pacific Northwest Site Office
Purgewater Storage and Treatment Facility Unit #1 ClosureCX(s) Applied: B6.1Date: 08/19/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Construction of 241-TY Interim Surface BarrierDate: 08/18/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Facility Upgrades at 222-S Laboratory ComplexCX(s) Applied: B1.3, B1.7, B1.15, B1.31Date: 08/18/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office