CX-005680: Categorical Exclusion Determination

Olympia-South Elma #1 Upgrade (21/10 and 21/11) 2011CX(s) Applied: B4.6Date: 04/20/2011Location(s): Grays Harbor County, WashingtonOffice(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

April 20, 2011
Estimated Read Time   min
Olympia-South Elma #1 Upgrade (21/10 and 21/11) 2011
CX(s) Applied: B4.6
Date: 04/20/2011
Location(s): Grays Harbor County, Washington
Office(s): Bonneville Power Administration

The scope of work includes; Replace the Type D structure at 21/11 with a type KF structure, install new hardware and guys on structure 21/10, provide new Aluminum Conductor-Steel Reinforced (ACRS) Ibis conductor, overhead ground wire, and jumpers into the South Elma Substation.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD