Categorical Exclusion Determinations: Washington

Small Mammal Sampling Near Waste Management Area C, 200 East Area, Hanford Site, Richland, WashingtonCX(s) Applied: B3.1Date: 11/03/2010Location(s): Richland, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Interstate Electric Vehicle Infrastructure ProjectCX(s) Applied: A9, B5.1Date: 10/20/2010Location(s): WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Perform Research of Groundwater Drainage and Flooding Issues at Covington Complex Through the Installation of Four Groundwater Monitoring WellsCX(s) Applied: B3.6Date: 10/18/2010Location(s): King County, WashingtonOffice(s): Bonneville Power Administra...
Replace Two Broken Transformers Near the Roza Dam Adult Trap FacilityCX(s) Applied: B4.6Date: 10/13/2010Location(s): Kittitas County, WashingtonOffice(s): Bonneville Power Administration
Project T-221, Hazardous Material Management and Emergency Response (HAMMER) Operations BuildingCX(s) Applied: B1.15Date: 10/08/2010Location(s): Richmond, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Puget Sound Clean Cities Coalition Petroleum Reduction ProjectCX(s) Applied: B5.1Date: 10/08/2010Location(s): Seattle, WashingtonOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Replace Spacer Dampers Along the Chief Joseph PH-Chief Joseph Number 6 500-Kilovolt Transmission LineCX(s) Applied: B1.3Date: 10/05/2010Location(s): Douglas County, WashingtonOffice(s): Bonneville Power Administration
Advanced Energy Efficient Building Technologies for High Performance HospitalsCX(s) Applied: A9, A11Date: 09/30/2010Location(s): Redmond, WashingtonOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory