Categorical Exclusion Determinations: Washington

Grandview-Red Mountain Number 1 Proposed Transmission Line InterconnectionCX(s) Applied: B4.6Date: 09/08/2010Location(s): Benton County, WashingtonOffice(s): Bonneville Power Administration
Installation and Removal of Relays - Port Townsend Paper CompanyCX(s) Applied: B1.3Date: 09/08/2010Location(s): Port Townsend, WashingtonOffice(s): Bonneville Power Administration
Ramgen Supersonic Shock Wave Compression and Engine TechnologyCX(s) Applied: B3.6Date: 09/03/2010Location(s): Redmond, WashingtonOffice(s): Fossil Energy, National Energy Technology Laboratory
Establishing Electric Drive Vehicle Component ManufacturingCX(s) Applied: B1.31, B3.6, B5.1Date: 09/01/2010Location(s): Seattle, WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Hydro Electric Project - Snohomish Public Utility DistrictCX(s) Applied: A9, A11, B5.1Date: 08/31/2010Location(s): Everett, WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer ReplacementCX(s) Applied: B1.3Date: 08/25/2010Location(s): King County, WashingtonOffice(s): Bonneville Power Administration
Badger Canyon Substation Radio Communication Tower ProjectCX(s) Applied: B1.7, B1.19Date: 08/25/2010Location(s): Benton County, WashingtonOffice(s): Bonneville Power Administration