Mason Substation Metering Replacement Project CX(s) Applied: B1.7 Date: 06/25/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 25, 2012Mason Substation Metering Replacement Project
CX(s) Applied: B1.7
Date: 06/25/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration is proposing to remove existing equipment and install new revenue metering equipment in the existing Mason Substation.
CX(s) Applied: B1.7
Date: 06/25/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration is proposing to remove existing equipment and install new revenue metering equipment in the existing Mason Substation.