Bettas Road-Columbia No. 1 230 Kilovolt Transmission Line Thermal Upgrade CX(s) Applied: B4.13 Date: 05/25/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 25, 2012Bettas Road-Columbia No. 1 230 Kilovolt Transmission Line Thermal Upgrade
CX(s) Applied: B4.13
Date: 05/25/2012
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration
The project, as proposed, is to upgrade the existing Bettas Road-Columbia No. 1 230 kilovolt transmission line to a maximum operating temperature of 100 °C.
CX(s) Applied: B4.13
Date: 05/25/2012
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration
The project, as proposed, is to upgrade the existing Bettas Road-Columbia No. 1 230 kilovolt transmission line to a maximum operating temperature of 100 °C.