Reconstruction of V.T. Hanlon Substation CX(s) Applied: B4.11Date: 03/23/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Rapid City Substation Dry Creek Substation Transmission Line CX(s) Applied: B4.12Date: 02/03/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Construction of the Rapid City-Dry 115 kilovolt Transmission Line CX(s) Applied: B4.12Date: 02/03/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Geotechnical Investigation at the Sanford Lab in Lead, South Dakota CX(s) Applied: B3.1 Date: 10/15/2013 Location(s): South Dakota Offices(s): Fermi Site Office
The Geotechnical Investigation of the Long Baseline Neutrino Experiment Detector Site in South Dakota CX(s) Applied: B3.1 Date: 03/27/2013 Location(s): South Dakota Offices(s): Fermi Site Office
Capitol Building Air Handling Unit Replacement CX(s) Applied: A9, B5.1 Date: 03/25/2013 Location(s): South Dakota Offices(s): Golden Field Office
Developing Gas Stripping, Catalytic Fast Pyrolysis Conversion of Corn Stover to Drop-in Quality Hydrocarbons CX(s) Applied: A9, B3.6 Date: 05/09/2013 Location(s): South Dakota Offices(s): Golden Field Office
Lease in Lead, South Dakota CX(s) Applied: B1.24 Date: 11/28/2012 Location(s): South Dakota Offices(s): Berkeley Site Office
Feasibility Study Supporting Wind Development on the Standing Rock Sioux Tribe Indian Reservation CX(s) Applied: A9, B1.19, B3.1 Date: 08/29/2012 Location(s): South Dakota Offices(s): Golden Field Office
Multi-Phase Fluid Flow Simulation Assisted Exploration and Production of Hydrocarbons from Niobrara… CX(s) Applied: B3.1 Date: 08/02/2012 Location(s): South Dakota Offices(s): National Energy Technology Laboratory