Install Groundwater Monitoring Well North of S-Area for Z-Area Monitoring CX(s) Applied: B3.1 Date: 12/13/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Formed Core Sampler in Saltstone Disposal Facility Vault 2 CX(s) Applied: B6.3 Date: 12/09/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install an Alternate Air Purge for the Phase II Receipt Tanks (JT-71/7) CX(s) Applied: B2.5 Date: 12/08/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Carolinas Offshore Wind Integration Case Study CX(s) Applied: A9 Date: 12/08/2011 Location(s): North Carolina, South Carolina Offices(s): Golden Field Office
Installation of a Two 3-megavolt Ampere Reactive Capacitor Banks on a New Concrete Pad in A-Area CX(s) Applied: B1.7 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Domestic Water to River Water Cross Connection for the Biomass Cogeneration Facility CX(s) Applied: B2.5 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Preparation of Phase-Pure Standards CX(s) Applied: B3.6 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operation of Extrel MAX300LG Mass Spectrometer and VICI Metronics Dynacalibrator Calibration Gas Generator at 999-1W CX(s) Applied: B3.6 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Nuclear Infrastructure Upgrade to Enhance Teaching Capabilities in the Nuclear Systems Technology Program at Midlands Technical College CX(s) Applied: B1.28 Date: 11/28/2011 Location(s): South Carolina Offices(s): Nuclear Energy, Idaho Operations Office
Install Universal Wiring in Buildings 735-A, 735-4A, 735-7A, & 735-11A CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office