Subcontractor Will Provide Roof Repairs at 701-2K CX(s) Applied: B1.3Date: 11/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Steam Line Pole L-2 CX(s) Applied: B1.3Date: 11/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
General Chemical Support Operations for NHS, HP CX(s) Applied: B3.6Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Synthesis and Modification of Zeolites and Zeolite-type Materials CX(s) Applied: B3.6Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Nuclear Non-destructive Assay CX(s) Applied: B3.6Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
H-Area E3S Replacement & Argus Implementation CX(s) Applied: B2.2Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 703-H CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 225-8H CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-H CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace River Water Pelton Valves if Necessary and Remove Existing Valve Houses CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office