Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit Salt Batch Qualification CX(s) Applied: B3.6 Date: 01/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Heat Exchanger Removal and Disposition CX(s) Applied: B1.23 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fire Suppression System Modifications, 772-1F CX(s) Applied: B2.5 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modify Tank Return Header to Provide Hose Connection CX(s) Applied: B1.3 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Demolition of Building 250-2S CX(s) Applied: B1.23 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Trailer Space Roll Door North Side Purification CX(s) Applied: B1.3 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dynamic Mechanical Testing with Battery Electrolyte in Savannah River National Laboratory Designed Sample Holders CX(s) Applied: B3.6 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Scaled Saltstone Mixer Commissioning CX(s) Applied: B3.6 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Copper Catalyzed peroxide Destruction of Tank 48H Tetraphenylborate Wastes CX(s) Applied: B3.6 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construction of 37 Parking Spaces South of 251-4F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office