Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Insulation removal work in F-Tank Farm CX(s) Applied: B1.3 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Nonproliferation Technology Section - Nanomaterials Research CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Control Room Consolidation CX(s) Applied: B2.2 Date: 12/29/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
703-5B Air Operations Division Generator Replacement CX(s) Applied: B2.5 Date: 12/29/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Tar Sands Bitumen Extraction CX(s) Applied: B3.6 Date: 12/29/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Template Synthesis of Nanostructures CX(s) Applied: B3.6 Date: 12/29/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Additional Expanded Basin Storage Racks CX(s) Applied: B1.31 Date: 12/15/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sidewalks to School CX(s) Applied: B1.13 Date: 12/13/2011 Location(s): South Carolina Offices(s): Golden Field Office
Install Purge Water Management Unit(s) at Chemicals, Metals, and Pesticides Pits Monitoring Well(s) CX(s) Applied: B6.9 Date: 12/13/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office