Replace 766-H Deteriorated Grease Trap CX(s) Applied: B1.3 Date: 06/21/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace 607-6A Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Abandonment of M-Area Oil Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Perform Thermal Analysis and Thermal Exposures (TG-DTA) CX(s) Applied: B3.6 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
L Area Waste Water Drum Deformation - Vent Drums CX(s) Applied: B6.1 Date: 06/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Remove Roof Over the North-east Spill Basin 235-F CX(s) Applied: B1.23 Date: 06/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Decommissioning and Demolition (D&D) of 681-11N CX(s) Applied: B1.23 Date: 06/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Relocate Handi-House SRS-PB-01318 and Six Sealands from A-Area to N-Area Excess Area CX(s) Applied: B1.22 Date: 06/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Surface Water and Groundwater Sampling Pen Branch Floodplain near Chemicals Metals and Pesticides Pits CX(s) Applied: B3.1 Date: 06/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office