Installation of Roofing System on L Area Complex Building, Sections +91 and +148 CX(s) Applied: B1.3 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dismantle and Remove Low Level Waste Loading Station, Building 735-A CX(s) Applied: B1.23 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Analytical Development Wet Chemistry Methods CX(s) Applied: B3.6 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Modify the HB-Line Can Inerting System CX(s) Applied: B1.31 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sample and Remove HEPA Filters from 690-N (Ford) Building CX(s) Applied: B1.23 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
A-Area Alternate Fire Water Supply CX(s) Applied: B1.3 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Remove and Dispose of 107 A & B Tanks and Support Structure CX(s) Applied: B6.1 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hydrogen Charging Tritium Contaminated Metals CX(s) Applied: B3.6 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
F-Area Infrasturcture Improvement CX(s) Applied: B1.23 Date: 07/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Add Redundant Safety Significant Relief Valve to 773-2A CX(s) Applied: B2.5 Date: 07/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office