Pad 16 Perimeter Paving CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Machining and Fabrication in 723-A CX(s) Applied: B3.6 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Machining and Fabrication in 749-A CX(s) Applied: B3.6 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Storage Water Tank Level Wireless Instrumentation Upgrade CX(s) Applied: B2.2 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Relocate and Install Restroom Trailer to Savannah River National Laboratory Technical Area CX(s) Applied: B1.22 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Used Nuclear Fuel Dry Storage Phase I Pilot Project CX(s) Applied: B3.6 Date: 08/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pave a Parking Space Near Building 730-A CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Remove the Highpoint VAMP ED-641000-IT-RISH-6097A From Service CX(s) Applied: B2.2 Date: 08/03/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 08/03/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Preparation of Used Lead for Off-Site Shipment for Recycle CX(s) Applied: B6.8 Date: 08/02/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office