Groundwater Monitoring Well Installation at Mixed Waste Management Facility CX(s) Applied: B3.1 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Route Phase II Column Transfer Piping To Canyon Tank 11.1 CX(s) Applied: B2.5 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construct Administrative Support Building at Three Rivers Solid Waste Authority CX(s) Applied: B1.15 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replacement of A-Area Critical Fire Hydrant 3038 CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Re-supply of Electrical Loads Fed from 192-K & 183-3K CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fire Pumps Replacement at the K-Area Complex CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Prepare and Seal Exterior of Dry Room, Building 735-A CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
High Activity Waste Tank (HAWT) Disposition CX(s) Applied: B3.1 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Two Pre-engineered Canopies CX(s) Applied: B1.15 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
730-1B 3rd Floor Office Renovation CX(s) Applied: B1.3 Date: 05/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office