Routine Samples from the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) System CX(s) Applied: B3.6 Date: 10/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operation, Maintenance, and End of Life of Leeman Prodigy Inductively Coupled Plasma Emission Spectrometers (ICPES) Unit and Perkin Elmer Optima 3000 ICPES Unit CX(s) Applied: B3.6 Date: 10/22/2013 Location(s): South Carolina Offices(s): Savannah Riv...
Subcontractor Repair of Roof Leaks at 217-3H (Metal Roof). CX(s) Applied: B1.3 Date: 10/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Thermal-Chemical Decomposition of Graphite CX(s) Applied: B3.6 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
773-A E Wing A-Block Cell Window Replacements CX(s) Applied: B2.1 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Caustic Simulant Filterability Testing CX(s) Applied: B3.6 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Preparing of Environmental Samples for Analysis CX(s) Applied: B3.6 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Renovate/Modernize Lab C162, 773-A CX(s) Applied: B1.3 Date: 10/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 704-49S CX(s) Applied: B1.3 Date: 10/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
234-H Stack Collection Unit CX(s) Applied: B2.2 Date: 10/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office