Subcontractor Repair of Roof at 704-H CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Deactivation of the 236-H Facility CX(s) Applied: B1.28 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
773-A, E114 Roof Replacement CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 705-A CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 730-A CX(s) Applied: B1.3 Date: 10/10/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 704-3N CX(s) Applied: B1.3 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Radiological Evidence Examination Facility (REEF) Evidence Examinations CX(s) Applied: B3.6 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Lab C-131 Loading and Unloading of Vessels CX(s) Applied: B3.6 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Cast Stone Testing in the Engineering Development Lab CX(s) Applied: B3.6 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
High Performance Liquid Chromatography (HPLC) Analyses CX(s) Applied: B3.6 Date: 09/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office