Subcontractor Will Provide Roof Repairs at 703-46A CX(s) Applied: B1.3Date: 08/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 716-N CX(s) Applied: B1.3Date: 08/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
A-Area Antenna Field Restoration - 623-30G CX(s) Applied: B1.19Date: 08/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Saltstone Disposal Unit 3/5 Diverter Valve Spool Piece CX(s) Applied: B1.3Date: 08/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Electrical Receptacles in K-Area Ballistic Resistant Enclosures (BREs) CX(s) Applied: B2.5Date: 08/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Work Performed in the Glass Apparatus Lab CX(s) Applied: B3.6Date: 08/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dissolution of U-Al alloy and Th metal with Evaluation of Gas Generation and Evaluation for the Neutralization of Sodium Reactor Experiment (SRE) Fuel Simulant CX(s) Applied: B3.6Date: 08/24/2015 Location(s): South CarolinaOffices(s): Savannah River O...
Routine Modular Caustic Side Solvent Extraction Unit ( MCU) Support Work CX(s) Applied: B3.6Date: 08/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Low Activity Waste Pretreatment Resin Removal Testing CX(s) Applied: B3.6Date: 08/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace the Bartex Level Instrumentation for HB-Line Tanks NT-31/32 With Radar Level Instrumentation CX(s) Applied: B2.5Date: 08/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office