Section E B-Block Cell Windows 10-12 Replacement CX(s) Applied: B2.1Date: 10/06/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Hanford High Level Waste Melter Riser Crystal Settling Test CX(s) Applied: B3.6Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Density Determination by Gas Displacement Picnometry CX(s) Applied: B3.6Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Glovebox, LAB-GB-52-A CX(s) Applied: B1.3Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Renovation of 773-A Lab B-114 CX(s) Applied: B1.31Date: 10/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Component Development and Testing for Electrolytic Cells CX(s) Applied: B3.6Date: 09/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Addition of Oil Catch Pans at Crane Control Room Shield Window CX(s) Applied: B2.5Date: 09/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 741-2N CX(s) Applied: B1.3Date: 09/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
The Subcontractor Will Provide Roof Repairs at 717-5N CX(s) Applied: B1.3Date: 09/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 246-H CX(s) Applied: B1.3Date: 09/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office