Nitrate Conversion of Reillex Resin in 786-A CX(s) Applied: B3.6Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Advanced Fuel Cycle Initiative (AFCI) Americium/Curium Separations CX(s) Applied: B3.6Date: 05/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Work in the 723-A High Pressure Laboratory CX(s) Applied: B3.6Date: 05/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove of Diesel Fuel Storage Tank Located Adjacent to Access Gate 36 in E-Area CX(s) Applied: B6.1Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Perform Annual Flow Testing of Hydrants, Curb Boxes, and Fire Tank Systems in B-Area CX(s) Applied: B1.3Date: 05/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace 26 Fence Posts in the Security Fence Around 703-5B CX(s) Applied: B1.3Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
L-Lake Dock Replacement CX(s) Applied: B1.3Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Perform Soil Sampling by the Underground H-Canyon Exhaust Tunnel CX(s) Applied: B3.1Date: 05/10/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 730-A CX(s) Applied: B1.3Date: 05/02/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 701-8G CX(s) Applied: B1.3Date: 05/02/2016Location(s): South CarolinaOffices(s): Savannah River Operations Office