9975 Life Extension Test CX(s) Applied: B3.6Date: 10/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
151-1K Substation/switchgear Replacement CX(s) Applied: B1.3Date: 10/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Hanford HLW Melter Riser Crystal Settling Test CX(s) Applied: B3.6Date: 10/28/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
AT&T to Install Fiber Optic Cable Along South Carolina Highway 125 and SRS Road 1 CX(s) Applied: B1.7Date: 10/28/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of a 480-volt Electrical Line CX(s) Applied: B4.12Date: 10/28/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Development Pump Testing at 723-A Mechanical Shop, Room 161 CX(s) Applied: B1.3Date: 10/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Reservoir Finishing Relocation to HANM CX(s) Applied: B1.31Date: 10/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Shipping Containers 9975, 9977, and 9978 Annual Maintenance and Testing CX(s) Applied: B3.6Date: 10/26/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dissolution of U-Al Alloy and Th Metal with Evaluation of Gas Generation and Evaluation for the Neutralization of Sodium Reactor Experiment (SRE) Fuel Simulant CX(s) Applied: B3.6Date: 10/26/2015 Location(s): South CarolinaOffices(s): Savannah River O...
Saltstone Hopper Overflow Container (SHOC) Redesign CX(s) Applied: B1.3Date: 10/26/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office