2H Evaporator Scale Dissolution Studies CX(s) Applied: B3.6 Date: 03/10/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
221-18H Air Conditioning, Exhaust Fan, Receptacles CX(s) Applied: B2.1 Date: 03/07/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of New 208 Voltage Alternating Current Electrical Service for 707-C CX(s) Applied: B1.3 Date: 03/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Ductwork Modifications to Limit a Ground-Level Release CX(s) Applied: B2.5 Date: 03/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Derailed Relocation Outside L-Area Reactor Inner Fence CX(s) Applied: B1.13 Date: 03/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replacement of the 254-13H Safety Significant Standby Diesel Generator CX(s) Applied: B2.5 Date: 03/03/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Extraction-Scrub-Strip Testing for Modular Caustic-Side Solvent Extraction Support CX(s) Applied: B3.6 Date: 03/03/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 599 Corridor, 221-H CX(s) Applied: B1.3 Date: 01/30/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization and Analyses of Core Samples From 105-C Disassembly Basin CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Methane Reforming CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office