Subcontractor Will Provide Roof Repairs at 703-43A CX(s) Applied: B1.3Date: 01/27/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Make Repairs to the Roof of the H-Canyon (221-H) Truckwell Airlock CX(s) Applied: B1.3Date: 01/27/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Sidewalk Construction and Pedestrian Crossing Sign Installation CX(s) Applied: B2.3Date: 01/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
High Pressure Hydrogen Laboratory Experimental Operations CX(s) Applied: B3.6Date: 01/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Operation of Induction Furnace Fabrication Lab CX(s) Applied: B3.6Date: 01/20/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Operation of Argon Atmosphere Furnace in C-118 CX(s) Applied: B3.6Date: 01/20/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove 108-2L Suction Air Intake Vent Duct Piping CX(s) Applied: B1.28Date: 01/20/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repaint Fire Tank 915-K CX(s) Applied: B1.3Date: 01/20/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Fundamental Corrosion Studies in High-Temperature Molten Salt Systems for N CX(s) Applied: B3.6Date: 01/08/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Iodine Speciation CX(s) Applied: B3.6Date: 01/08/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office