Eleven Soil Bores Along the M-Area Abandoned Process Sewer Line for Vadose Zone Characterization CX(s) Applied: B3.1 Date: 05/19/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Receptacles for Rooms 614 and 621 CX(s) Applied: B1.3 Date: 05/15/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
H-Area Vehicle Barrier Installation CX(s) Applied: B1.15 Date: 05/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 701-1K CX(s) Applied: B1.3 Date: 05/13/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Corrosion Tests on Carbon Steel Exposed to Simulants CX(s) Applied: B3.6 Date: 05/12/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Nickel Treatment of Electrolytic Cells CX(s) Applied: B3.6 Date: 05/12/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dye Sensitized Solar Cells (DSSC) CX(s) Applied: B3.6 Date: 05/12/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Remove HEPA Filters From The Old HB-Line Exhaust System CX(s) Applied: B2.5 Date: 05/08/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Tank 12 Temporary Blower Stack CX(s) Applied: B2.5 Date: 05/08/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Conditioning Cane Fiberboard and Foam Samples CX(s) Applied: B3.6 Date: 05/08/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office