Renovation of 773-A, Lab B-107 CX(s) Applied: B1.31Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Raman and Absorption Spectroscopy CX(s) Applied: B3.6Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Savannah River National Laboratory Glass Shop Relocation & Operation at ACTL CX(s) Applied: B3.6Date: 03/21/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace and Relocate Uninterruptible Power Supply Y100 CX(s) Applied: B1.3Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Gate Cycle Counters for 701-1K and 701-2K Vehicle Gates CX(s) Applied: B2.2Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Ballistic Resistance Enclosure Turret Rotation CX(s) Applied: B1.3Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Relocate Beavers from Ponds Feeding Outfalls N-15 and N-16 CX(s) Applied: B1.3Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Ni-plating of Microscopy Coupons CX(s) Applied: B3.6Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Ventilation System for the Sodium Nitrite Makeup Tank (SNMUT) CX(s) Applied: B1.3Date: 03/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Characterization of Process Solutions and Solids CX(s) Applied: B3.6Date: 03/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office