Characterization of SRS Tank Farm Liquid, Salt cake, and Dilute Slurry Samples CX(s) Applied: B3.6Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
702-2A Heating, Ventilation, and Air Conditioning (HVAC) Installation CX(s) Applied: B1.3Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Basin Modifications to Receive Research Fuel CX(s) Applied: B2.5Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 238-H CX(s) Applied: B1.3Date: 12/04/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Moisture Retention Testing of Saltstone Grouts, Cementitious Samples, Soil Samples, and Sediment Samples CX(s) Applied: B3.6Date: 12/04/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Reroute 221-S Gas Chromatograph Common Return Line per J-DCF-S-03003 CX(s) Applied: B1.3Date: 12/04/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Disposition of Empty Compressed Gas Cylinders Containing Instrument Calibration Gas CX(s) Applied: B1.3Date: 12/03/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dissolution Thorium Metal with Evaluation of Gas Generation and Evaluation for the Neutralization of Sodium Reactor Experiment (SRE) Fuel Simulant CX(s) Applied: B3.6Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Motor Silencer Installation CX(s) Applied: B1.21Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Flammable Gas Monitor CX(s) Applied: B1.3Date: 12/02/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office