Repainting Portions of 902-1F and 902-2F Fire Water Storage Tanks CX(s) Applied: B1.3Date: 12/15/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Inhibited Water Header Drain Addition on Tank 11 and Tank 15 CX(s) Applied: B1.3Date: 12/11/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Removal of Leaked Normal Cooling Water (NCW) on 1st Level CX(s) Applied: B1.3Date: 12/10/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Control of Algae at the 281-8H Basin CX(s) Applied: B1.6Date: 12/10/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Cast Stone Testing Using Tank 50 CX(s) Applied: B3.6Date: 12/10/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Canada Target Residue Material (CANTRM) Mock-up and Test CX(s) Applied: B3.6Date: 12/09/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Testing Soils/Sediments for "Available Reducing Capacity" CX(s) Applied: B3.6Date: 12/09/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 773-A, E-114 CX(s) Applied: B1.3Date: 12/09/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Plant Accumulators Study CX(s) Applied: B3.6Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Strippable Coatings CX(s) Applied: B3.6Date: 12/08/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office