Installation of Elevated Fire Water Storage Tank (geotechnical survey) CX(s) Applied: B2.5Date: 41865 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Z-Area Fire Tank Painting CX(s) Applied: B1.3Date: 41865 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Elevated Fire Water Storage Tank CX(s) Applied: B2.5Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Groundwater Characterization and Well Installation at the P-Area Reactor Groundwater Operable Unit CX(s) Applied: B3.1Date: 41864 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building CX(s) Applied: B1.15Date: 41863 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Alternative Chemical Cleaning for Sludge Heel Removal and MCU Oxalate and Aluminate Solubility - Simulant Nonrad Testing CX(s) Applied: B3.6Date: 41863 Location(s): South CarolinaOffices(s): Savannah River Operations Office
H-Area Vehicle Barrier Installation CX(s) Applied: B1.15Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Elevated Fire Water Storage Tank CX(s) Applied: B2.5Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building CX(s) Applied: B1.15Date: 41862 Location(s): South CarolinaOffices(s): Savannah River Operations Office
SRNL C-041 Control Room Alarms (CHEX, OGE, CE) Upgrade (Wireless) CX(s) Applied: B1.3Date: 41858 Location(s): South CarolinaOffices(s): Savannah River Operations Office