The EEC covers the method development with prototype samples such as alanates, waste glass simulants, and other samples such as test soils to be te…
This activity is the general operation of a selective laser sinter 3D printer, specifically the FormLabs Fuse1, and associated accesories (i.e. Fus…
For reliability and to minimize cost, the existing MG sets will be replaced by two new solid-state battery chargers.…
This Tritium facility modification project is being initiated to procure and install a new vault door as a replacement for the current door set in …
We are removing the valve and thus converting the fire suppression system in Room 54 to a permanently "wet" system.…
The scope is to design and replace the IML AHU system with equivalent equipment that is more reliable and maintainable.…
Renovations are needed in Building 246-H. Enhancements will be made to flooring, common areas, and exterior signage.…
The Ingersoll Rand SSR-XP10 air compressor and Parker Airtek TW25 air dryer, along with the air dryer pre filter and after filter, are to be remove…
The purpose of this modification is to provide for the design, fabrication, and installation of new extraction equipment stands and cask trolley to…
The proposed activity (PA) is a redesign of the existing Modular Stripper (MDST) blowers under MT-TRI-2021-00034.…