This EEC will cover installation and operations of Picarro 2140-i Isotopic Water Analyzer and Autosampler System.…
This activity concerns the receipt, sample examination, and disposal of tritiated samples.…
The objective of this work is to characterize materials by performing electrochemical and corrosion tests at low temperatures or in the presence of…
A Dominion Energy subcontractor, Marshfield Forest Service, will be conducting herbicide applications to the 115-kV and 230-kV electricity transmis…
The iAir (electronic control) capability for humidity control is being removed from the Saltstone Administrative Building Air Handling Units.…
The 115 kV transformers, both switchgears A and B, associated 4160V secondary cables, protective relaying, breakers, and control wiring, 480V trans…
Argus Access Controls will be added to Door 156 in Building 717-K.…
Two metal panels cover part of an expansion joint in the 105-L Disassembly Basin, in the Dry Cave portion of the basin area. These metal panelsare …
Salt solutions (sodium nitrate) will be prepared and mixed with varius sorbents to solidify the salt solution.…
Trailers 241-119H and 241-120H will be demolished and replaced with new trailers.…