The 292-S Diesel Fuel Oil (DFO) Underground Storage Tanks (UST) No 1 will undergo draining, cleaning and inspection. During inspection, determinati…
Remove the various oils from equipment inside 284-H as part of facility layup.…
Access to Steel Creek to perform routine long-term sampling of surface water and shallow monitoring wells is not easily accessible. Samplers are re…
The Decon Frit Slurry Recirculation Pump experiences premature diaphragm failures. Review of the manufacturer 's literature identified operational …
Premix Air Blender No 2 Dust Collector (Z-205000-BMH-DCOL-0005) is in need of repair due to brief pressure excursion during normal operation.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
The existing Liquid Nitrogen delivery system for 735-A lab D-007 has failed due to age and deterioration. This work will include replacement of the…
Six degraded trailers SRS-PB-01030, SRS-PB-01032 (776-12A), SRS-PB-01033 (776-13A), 774-23A, 774-4A, and 774-5A known to contain asbestos containin…
This project will demonstrate an innovative, energy efficient water treatment system for FGD wastewater treatment to remove the key contaminants in…
Thermal Cycle Absorption Process (TCAP) Product Bed C is to be replaced by new components.…