Replace light fixtures with LEDs at 711-N, 711-9N, 717-10N.…
Perform renovations in Building 735-A, Prep/Paint Walls, ceilings, cabinets, install new floor covering, cove base, apply floor finish to new floor…
Steam pipe 3/4 in.-LS-30-3 will be cut at the pipe support after valve LS-V-360.…
Add Inner Canister Closure Station (ICCS) flange heater platform and remove swing arm motor and gearbox.…
Installation of isolation valve for 782-2A.…
703-43A Install handrail on south steps.…
751-1A Parking lot improvements.…
226-2F East Parking Lot-Clean and Re-Stripe.…
This modification will replace E3S components in L-Area with Argus.…
Load Center-B1 will be taken out of service for Preventative Maintenance.…