Demolition and disposition of bldg. 703-1B uninterruptible power supply.…
Rad samples are analyzed on the Rad Microtrac S3500 Particle Size Analyzer located in 773-A C-150. Non-Rad samples are analyzed on the Microtrac S3…
Augusta Industrial to pressure wash internal cooling tower basin at 285-11F.…
Remove suspect asbestos material from metal 291-H Breech House and concrete stack joint.…
Replacement of area velocity flow sensor at stream surveillance location FM-A7.…
Remove suspect asbestos material from metal 291-H Breech House and concrete stack joint.…
Repair, prep, and paint interior walls at 704-N.…
Two characterization soil borings will be advanced near Building 717-A to verify the presence or absence of residual volatile organic compound mass…
Cascade, the environmental drilling services provider, has been retained to convert recovery wells RWM-9, RWM-11, RWM-13B and…
This revision covers the installation of RWM-001-R. The construction of the mechanical and electrical commodities will be addressed at a later date…