Provide fire sprinkler suppression and fire alarm (exhaust duct) smoke detection in Facility 234-7H…
Relocation of the duct detector BE-14 in room 102 to the upstream of the same duct in room 122 will allow access to the duct detector without the u…
Replace the Modicon Quantum PLC with an Emerson DeltaV Safety Instrumented System with Electronic Marshalling.…
To continue to meet the surveillance mission while developing new systems, the installation of the vibration machine in 248-H is imperative and sho…
This activity is for completion of Safe Shutdown thru Phase 1 Deactivation of 237-H/238-H/238-1H facilities. Although individual building numbers, …
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
The once-thru AHU and exhaust system for the Inert Loading Facility (rooms 324 and 325) shall be replaced with an equivalent system that is more re…
We will live-trap raccoons and opossums at (30) study sites across SRS to study the factors affecting rabies elimination.…
The objective of this project is to evaluate the ecology of wildlife-vehicle interactions with respect to human perception, animal perception and b…
Funding will support the project team's small-scale research and development of a casting technology capabable of producing high-value metal compon…