Sorbent, Catalyst, Photochemical - Analytical Methods Development Laboratory CX(s) Applied: B3.6 Date: 05/25/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Peter Wentz Geothermal CX(s) Applied: B5.19 Date: 05/23/2012 Location(s): Pennsylvania Offices(s): Golden Field Office
29th Annual International Pittsburgh Coal Conference at the David L. Lawrence Convention Center CX(s) Applied: A1 Date: 05/22/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water CX(s) Applied: B3.6 Date: 05/14/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
2009 National Biodiesel Foundation Biofuel Infrastructure Project CX(s) Applied: B5.22 Date: 05/09/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
High Performance Reflector Panels for Concentrating Solar Power Assemblies - Thermata CX(s) Applied: B3.6 Date: 05/07/2012 Location(s): Pennsylvania Offices(s): Golden Field Office
High Performance Reflector Panels for Concentrating Solar Power Assemblies - Solar CX(s) Applied: B3.6 Date: 05/07/2012 Location(s): Pennsylvania Offices(s): Golden Field Office
A-6 Office Building CX(s) Applied: B1.15 Date: 04/19/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program
L-Building Demolition and Site Restoration CX(s) Applied: B1.16, B1.17, B1.23 Date: 04/19/2020 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program
Surface Analysis Laboratory (Site Relocation) CX(s) Applied: B3.6 Date: 04/05/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory