Utility Corridor Extension CX(s) Applied: B4.7, B4.11, B5.2, B5.5 Date: 06/13/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program, Bettis Site
Office of NEPA Policy and Compliance
June 13, 2012Utility Corridor Extension
CX(s) Applied: B4.7, B4.11, B5.2, B5.5
Date: 06/13/2012
Location(s): Pennsylvania
Offices(s): Naval Nuclear Propulsion Program, Bettis Site
The scope of the Utility Corridor Extension project includes extension of underground utilities from the existing site utility corridor. The project is necessary to provide services to future buildings identified in the Ten-Year Facilities Plan and the Bettis Site Master Plan.