Building 93 Heat Exchanger Removal at National Energy Technology Laboratory Pittsburgh CX(s) Applied: B1.23, B1.31 Date: 06/19/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Utility Corridor Extension CX(s) Applied: B4.7, B4.11, B5.2, B5.5 Date: 06/13/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program, Bettis Site
Categorical Exclusion Determination
Sorbent, Catalyst, Photochemical - Analytical Methods Development Laboratory CX(s) Applied: B3.6 Date: 05/25/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Peter Wentz Geothermal CX(s) Applied: B5.19 Date: 05/23/2012 Location(s): Pennsylvania Offices(s): Golden Field Office
29th Annual International Pittsburgh Coal Conference at the David L. Lawrence Convention Center CX(s) Applied: A1 Date: 05/22/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water CX(s) Applied: B3.6 Date: 05/14/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
2009 National Biodiesel Foundation Biofuel Infrastructure Project CX(s) Applied: B5.22 Date: 05/09/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
High Performance Reflector Panels for Concentrating Solar Power Assemblies - Thermata CX(s) Applied: B3.6 Date: 05/07/2012 Location(s): Pennsylvania Offices(s): Golden Field Office
High Performance Reflector Panels for Concentrating Solar Power Assemblies - Solar CX(s) Applied: B3.6 Date: 05/07/2012 Location(s): Pennsylvania Offices(s): Golden Field Office