Replace Potable Water Supply Line: Phase Two (Project Modification) CX(s) Applied: B1.3, B1.16, B1.32 Date: 10/24/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Material Dynamics and Kinetics Lab CX(s) Applied: B3.6 Date: 10/17/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Heat Integration with Solid Sorbent Based Carbon Dioxide Capture CX(s) Applied: A9 Date: 10/08/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Continuous Regional Methane Emissions Estimates in Northern Pennsylvania Gas Field Using Atmospheric Inversions CX(s) Applied: A9, B3.1 Date: 10/01/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Continuous Regional Methane Emissions Estimates in Northern Pennsylvania Gas Field Using Atmospheric Inversions CX(s) Applied: A9, B3.1 Date: 10/01/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
INITIATE A TEN YEAR UTILITY SERVICE CONTRACT FOR NETL PITTSBURGH CX(s) Applied: A1 Date: 10/01/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Advanced Acid Gas Separation Technology for Clean Power and Syngas Applications CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
B-922 Sprinkler System Replacement CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Replace B920 Fire Wall Line: Phase Two CX(s) Applied: B1.3 Date: 09/24/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Advanced Catalytic Solvent for Carbon Dioxide (CO2) Capture CX(s) Applied: A9 Date: 09/23/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory