High Energy, Long Cycle Life Lithium-ion Batteries for PHEV Applications CX(s) Applied: B3.6 Date: 09/10/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
B-922 Grease Interceptor Replacement CX(s) Applied: B1.3, B1.31 Date: 09/09/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
A New Generation of Building Insulation by Foaming Polymer Blend Materials with Carbon Dioxide CX(s) Applied: A9, B3.6 Date: 08/29/2013 Location(s): Pennsylvania Offices(s): Golden Field Office
Fluorescent Pigments for High Performance Cool Roofing and Facades CX(s) Applied: B3.6 Date: 08/28/2013 Location(s): Pennsylvania Offices(s): Golden Field Office
Arc Flash Hazard Mitigations - Pittsburgh CX(s) Applied: B1.15, B2.5 Date: 08/27/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Wildlife Management Program Support CX(s) Applied: A9, B1.20 Date: 08/08/2013 Location(s): West Virginia, Pennsylvania Offices(s): National Energy Technology Laboratory
Building 58 Third Floor Mezzanine Enclosure CX(s) Applied: B2.1, B2.2, B2.3 Date: 07/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Site Wide Exterior Door Repair/Replacement Project CX(s) Applied: B2.1, B2.5 Date: 07/17/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Modification to Demolish Building 900A and Reconstruct Building 900 Project CX(s) Applied: B1.3, B1.15 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory