Categorical Exclusion Determinations: Pennsylvania

High Energy, Long Cycle Life Lithium-ion Batteries for PHEV Applications CX(s) Applied: B3.6 Date: 09/10/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
A New Generation of Building Insulation by Foaming Polymer Blend Materials with Carbon Dioxide CX(s) Applied: A9, B3.6 Date: 08/29/2013 Location(s): Pennsylvania Offices(s): Golden Field Office
Pittsburgh Site Wide Exterior Door Repair/Replacement Project CX(s) Applied: B2.1, B2.5 Date: 07/17/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Modification to Demolish Building 900A and Reconstruct Building 900 Project CX(s) Applied: B1.3, B1.15 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory