B902 Wall Cladding and Roof Replacement CX(s) Applied: B2.1, B2.3, B2.5Date: 41863 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Multi-Sensor Inspection and Robotic Systems for Dry Storage Casks – Pennsylvania State University CX(s) Applied: B3.6Date: 41863 Location(s): PennsylvaniaOffices(s): Nuclear Energy
Multi-Sensor Inspection and Robotic Systems for Dry Storage Casks – Pennsylvania State University CX(s) Applied: B3.6Date: 41863 Location(s): PennsylvaniaOffices(s): Nuclear Energy
Building 920 AHU-1 Replacement Project CX(s) Applied: B1.15, B1.23, B2.1Date: 41862 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Novel Thermal Break with Simplified Manufacturing for R7 Commercial Windows Award Number: DE-EE0006716 CX(s) Applied: A9, B3.6
Geophysical and Mineralogical Controls on the Rheology of Fracture Slip… CX(s) Applied: B3.6Date: 41855 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Renovation of 920 Plateau West Parking Lot Drainage System and Wallace Road Curb Installation Project CX(s) Applied: B1.15, B1.33, B2.5Date: 41852 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Building 94 HVAC Upgrades Project CX(s) Applied: B1.15, B1.23, B2.1, B2.2Date: 41852 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
A Geomechanical Model for Gas Shales Based on Integration of Stress (Project Extension) CX(s) Applied: A9, A11Date: 41851 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Novel Transparent Phosphor Conversion Matrix with High Thermal Conductivity for Next Generation... CX(s) Applied: B3.6Date: 41848 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory