B902 Wall Cladding and Roof Replacement CX(s) Applied: B2.1, B2.3Date: 07/28/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Building 84 MCCF Demolition Project CX(s) Applied: B3.6Date: 07/23/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Understanding Transient Combustion Phenomena in Low-NOx Gas Turbines CX(s) Applied: A9, B3.6Date: 07/21/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
B-922 West Office Renovation: 1st, 2nd & 3rd Floors CX(s) Applied: B1.3, B1.15, B2.1Date: 07/07/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
N2 Dewar Pad Renovation and Building 73 Demolition CX(s) Applied: B2.2, B2.3Date: 07/02/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Effect of Mixture Concentration Inhomogeneity on Detonation Properties CX(s) Applied: B3.6Date: 07/01/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Design/Fab/Characterization of Near Surface Embedded Cooling Channel w ODS Layer CX(s) Applied: A9, B3.6Date: 07/01/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Optimized Comfort Systems for Low Load Homes Award Number: DE-EE0007058 CX(s) Applied: A9, A11, B3.1 Building Technologies Office Date: 06/22/2015 Location(s): PA Office(s): Golden Field Office
Access Control Expansion CX(s) Applied: B2.2, B2.3Date: 06/18/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Penske Truck Leasing AFV Demonstration and Enhanced Driver Experience Project CX(s) Applied: A1, A9, B5.1Date: 05/19/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory