This project includes replacement of the 920 interrupter switch.…
R and D Plateau Parking Lot Seal Coat and Line Striping, 920 Plateau Sidewalk Lighting and Underground Wiring Replacement, 900/920 Area Replacement…
Award Number: DE-EE0009117, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): PA, Office(s): Golden Field Office
Award Number: DE-EE0009106, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): PA, Office(s): Golden Field Office
Spectral Energies and Penn State University propose to develop a technology for post-processing the welding microstructure via highly localized ann…
Create knowledge base that delineates requirements to support domestic US REE Industries.…
Computational and experimental studies on converting coal-derived syngas into liquid methanol using an electrochemically pumped membrane reactor.…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
Computational and laboratory R and D related to Core ShellMetal Organic Frameworks for Direct Air Capture.…