The University of Pittsburgh proposes to acquire two thermophysical property measurement systems-a laser flash analyzer and a thermomechanical anal…
The fire alarm system in TRA 679 is in need of an upgrade.…
Replace Substation 6 electrical switchgear and associated items-fencing, concrete pad, etc.…
Replace existing B-84 Summer Boiler and associated pumps and controls.…
This project includes replacement of the potable and fire water pipes on the NETL PGH R and D Plateau near the B-95 entrance gate and the Northeast…
Renovate existing first floor space on the north end of the building and construct a two-story building addition for the new Data Center.…
This project includes the remodel of Building 920 and the demolition of Building 923. …
Replace 15 exterior doors on the NETL PGH Campus.…
This project includes replacement of the 920 interrupter switch.…
R and D Plateau Parking Lot Seal Coat and Line Striping, 920 Plateau Sidewalk Lighting and Underground Wiring Replacement, 900/920 Area Replacement…