The planned R&D includes experiments, engineering design, and modeling in order to develop a design optimization tool that simultaneously optimizes...
This project includes replacement of the potable water pipes and fire water pipes on the 900 plateau and near Building 167.…
Westinghouse Electric Company proposes to prepare for construction of the Nuclear Demonstration Unit (NDU) for the eVinciTM Micro Reactor through d…
Award Number: DE-EE0008763, CX(s) Applied: A9, B3.6, Geothermal Technologies Office, Location(s): PA, Office(s): Golden Field Office
The proposed action would occur in two stages. The first stage would be installation of National Geodetic Survey-style monuments at four proposed l…
The proposed action would occur in two stages. The first stage would be installation of National Geodetic Survey-style monuments at four proposed l…
The Geomechanics and Flow Lab will combine three previously permitted NETL labs: GGSCFL, Degradation of Wellbore Cements Due to CO2 Injection, and …
Research on Thermal Energy Storage at coal-fired power plants to improve unit flexibility. The project will develop thermosiphons immersed in cemen…
Demonstrate a secure private blockchain protocol designed for fossil power generation systems. …
The project includes replacement of the Firing Range ventilation system, replacement of the roof membrane to eliminate entry of precipitation into …