Pole Replacements on the Cougar-Thurston #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 03/18/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Keeler Substation Electrical Reactor Replacement CX(s) Applied: B4.11Date: 03/18/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Converting Natural Gas to Liquid Fuels by Low Energy Electrical Corona Discharge Processes CX(s) Applied: B3.6Date: 03/17/2016 Location(s): OregonOffices(s): Advanced Research Projects Agency-Energy
Recovery Act: Crump Geyser - High Precision Geophysics & Detailed Structural Exploration and Slim Well Drilling Award Number: DE-EE0002835 CX(s) Applied: B3.1 Geothermal Technologies Office Date: 07/17/2014 Location(s): OR Office(s): Golden Fiel...
Bonneville-Hood River Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 03/04/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Windwave Fiber Installation at Big Eddy Substation CX(s) Applied: B4.7Date: 02/25/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Access Road Easement Acquisition for DeMoss-Fossil No. 1 Transmission Line CX(s) Applied: B1.24Date: 02/24/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Coyote Springs-Boardman Fiber Project CX(s) Applied: B4.7Date: 02/17/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Keeler Substation Septic System Retirement CX(s) Applied: B1.27Date: 02/12/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Damper Installations on the Cougar-Thurston #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 02/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration