Creep Laboratory CX(s) Applied: B3.6Date: 05/13/2016 Location(s): OregonOffices(s): National Energy Technology Laboratory
Pearl-Keeler Transmission Line Structure Modifications CX(s) Applied: B4.13Date: 05/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration
U.S. Forest Service Pacific Northwest Region Photovoltaic Systems Award Number: DE-EE0007459 CX(s) Applied: A9 Federal Energy Management Program Date: 04/13/2016 Location(s): OR Office(s): Golden Field Office
B31 Fracture Mechanics Testing Lab CX(s) Applied: B3.6Date: 04/28/2016 Location(s): OregonOffices(s): National Energy Technology Laboratory
Hat Rock Substation Upgrades CX(s) Applied: B4.1Date: 04/22/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Fairview-Bandon No. 1 Span 12/2 Impairment Remedy CX(s) Applied: B1.3Date: 04/15/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Marion-Alvey Transmission Line Mile 1-43 Access Road Upgrade Project CX(s) Applied: B1.3Date: 04/14/2016 Location(s): OregonOffices(s): Bonneville Power Administration
ELI Fiber Splicing Project at Salem Substation CX(s) Applied: B4.9Date: 04/12/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Wren Substation Fence Replacement CX(s) Applied: B1.11Date: 03/28/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Survivability and Lower Cost in a Submerged Wave Energy Device Award Number: DE-EE0007345 CX(s) Applied: A9, B3.6 Wind and Water Power Technologies Office Date: 03/21/2016 Location(s): OR Office(s): Golden Field Office