Bonneville Power Administration (BPA) is proposing to fund the Confederated Tribes of the Grand Ronde to purchase the Jordan Valley Conservation, w…
Install fault indicators, recloser devices, and reconfigure/underground (where feasible)older primary wire. These measures improve outage response,…
Bonneville Power Administration (BPA) proposes to correct one impairment on the John Day-Grizzly 500-kV No. 2 line and improve and reconstruct an a…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWS) to implement a low-…
These activities will be to fabricate and repair metal alloy test articles and components using a FormAlloy X2 system involving simultaneous or sep…
Bonneville Power Administration (BPA) proposes to remove and/or trim about 35 danger and hazard trees along the Filbert Tap to Forest Grove No. 1 t…
Bonneville Power Administration (BPA) proposes to develop and execute Residential Purchase and Sale Agreements (RPSAs) for the post-2028 Residentia…
Bonneville Power Administration (BPA) proposes to remove and replace a MOD at the Marion Substation. The work would include removal and replacement…
Bonneville Power Administration (BPA) proposes to improve the existing access road system along the Toledo-Wendson No. 1 transmission line in south…
Bonneville Power Administration (BPA) proposes to improve access roads along the Jones Canyon-Santiam No. 1 transmission line in Marion County, Ore…