This Third Amended Determination follows the approval of additional funding, extended period of performance, change of project location, and new project milestones to support the project team's small-scale research and development activities to enable microbial production of methanol from methane feedstock, in progress under the Optimized Flexible Fuels using Grid-free Reactors with Intermittent Delivery (OFF GRID, formerly GREENWELLS) Program.
The Knolls Laboratory L4 Pumphouse Sinkhole Repair Project is being undertaken to repair an existing concrete retaining wall along the edge of the Mohawk River where the river water flow is eroding the retaining wall and the surrounding shale rock face.
The Kesselring Site Building 28 AMB Test Facility Project consists of renovation to the basement to support upcoming testing.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to GE Vernova Operations LLC, DBA GE Vernova Advanced Research Center (GE Vernova) to develop and mature polymeric add-on technology for improved hydropower operation.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to E2H2NANO, LLC (Buffalo, NY) to scale up and prototype efficient ammonia production at moderate temperatures and pressures.
The U.S. Department of Energy (DOE) is proposing to provide funding to The Rapid Advancement in Process Intensification Deployment Manufacturing Institute (RAPID) to coordinate, organize, and support activities related to education and workforce development and future technological development projects, however, the current effort is limited to project and portfolio management for the technological development program.
This Amended Determination addresses the small-scale research and development activities of a process to recycle critical minerals from e-waste, spent catalytic converters, and other waste sources by leveraging ChemFinity’s porous sorbent material technology.
This project aims to develop an environmentally friendly and economically viable hydrometallurgical method for extracting nickel (Ni) and cobalt (C…
The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
The Kesselring Site Outfall 002 Redesign and Replacement Project consists of raising the bottom elevation of the Outfall 002 trench to eliminate the standing water that produces algae and the potential for turbulent discharges to the Glowegee Creek.