This Second Amended Determination follows the approval of additional funding, period of performance, and new project milestones to support the project team's small-scale research and development activities to further advance their electric aviation engine and cooling system designed under the Aviation-class Synergistically Cooled Electric-motors with iNtegrated Drives (ASCEND) program.
This Second Amended Determination follows the approval of additional funding, period of performance, and new project milestones to support the project team's small-scale research and development activities to further advance their solution for effectively managing complex fluoride salt waste from reactors under the Optimizing Nuclear Waste and Advanced Reactor Disposal Systems (ONWARDS) program.
Mechanical Room L-23 is a metal shed residing outdoors north of Building 902. The proposed action is to demolish the shed by unscrewing the wall pa…
Work will involve the construction of temporary guard booths adjacent to the Science and User Support Center (Building 101) facility to accommodate…
12-mile, 23.9 kV distribution line southwest from the Grasse River Substation to Springs Park, a portion of the existing 8.32 kV system (Circuit 61…
The project will be the complete physical demolition of ST0690. ST0690 is a 6,000 square foot wood structure constructed in 1991. The facility does…
Replacing previously reviewed subrecipient NexGen with Semiconductor Components Industries, LLC. (dba onsemi). Subrecipient activities (characteriz…
The project will be the complete physical demolition of Building 526. Building 526 is 27,194 sq. ft. and was built in 1943. The building was used f…
The U.S. Department of Energy (DOE) is proposing to administer congressionally directed spending to the City of Ithaca (Ithaca), New York to design…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Free Form Fibers, LLC (FFF) to develop and test a new approach to ma…