An aerostat (a tethered aerodynamic helium balloon), a low altitude (less than 2000 meters [m] above ground level) drifting helium balloon, and a h…
Scope of work at the Protective Force Training Complex would include administrative work, classroom training, live fire activities, mounted and dis…
Building 23-424, Equipment Storage is a framed tent structure in Area 23 (Mercury) at the Nevada National Security Site (NNSS). This structure was …
The project would deploy Light Detection and Ranging (LIDAR) equipment to generate scans of the tunnel exteriors and other facilities. …
Categorical Exclusion Determination
As part of planning activities for the CP Hill waterline replacement, subsurface utility discovery work needs to be performed along selected portio…
Award Number: DE-EE0006731CXs Applied: A9, A11, B3.1Geothermal Technologies OfficeLocation: NVOffice: Golden Field Office
Building 23-517, also known as the Bowling Alley, is located in Area 23 (Mercury) at the Nevada National Security Site (NNSS). This building has no…
The Mercury Solar Expansion Project would install a solar photovoltaic (PV) array on the south side of Mercury Fire Station No. 1 in Area 23 (Mercu…